New South Wales Consolidated Regulations

[Index] [Table] [Search] [Search this Regulation] [Notes] [Noteup] [Download] [Help]

BALRANALD LOCAL ENVIRONMENTAL PLAN 2010

- Made under the Environmental Planning and Assessment Act 1979
- As at 17 April 2020
- Reg 363 of 2010

TABLE OF PROVISIONS

   PART 1 - PRELIMINARY

   1.1.    Name of Plan
   1.1AA.  Commencement
   1.2.    Aims of Plan
   1.3.    Land to which Plan applies
   1.4.    Definitions
   1.5.    Notes
   1.6.    Consent authority
   1.7.    Maps
   1.8.    Repeal of planning instruments applying to land
   1.8A.   Savings provision relating to development applications
   1.9.    Application of SEPPs
   1.9A.   Suspension of covenants, agreements and instruments

   PART 2 - PERMITTED OR PROHIBITED DEVELOPMENT

   2.1.    Land use zones
   2.2.    Zoning of land to which Plan applies
   2.3.    Zone objectives and Land Use Table
   2.4.    Unzoned land
   2.5.    Additional permitted uses for particular land
   2.6.    Subdivision--consent requirements
   2.7.    Demolition requires development consent
   2.8.    Temporary use of land
           Land Use Table
           Note
           Zone RU1. Primary Production
           Zone RU3. Forestry
           Zone RU4. Primary Production Small Lots
           Zone RU5. Village
           Zone E1. National Parks and Nature Reserves
           Zone W1. Natural Waterways
           Zone W2. Recreational Waterways

   PART 3 - EXEMPT AND COMPLYING DEVELOPMENT

   3.1.    Exempt development
   3.2.    Complying development
   3.3.    Environmentally sensitive areas excluded

   PART 4 - PRINCIPAL DEVELOPMENT STANDARDS

   4.1.    Minimum subdivision lot size
   4.1AA.  Minimum subdivision lot size for community title schemes
   4.2.    Rural subdivision
   4.2A.   Strata subdivision of residential or tourist and visitor accommodation in certain rural zones
   4.2B.   Erection of dwellings in rural zones
   4.2C.   Rural workers' dwellings
   4.3.    Height of buildings
   4.4.    Floor space ratio
   4.5.    Calculation of floor space ratio and site area
   4.6.    Exceptions to development standards

   PART 5 - MISCELLANEOUS PROVISIONS

   5.1.    Relevant acquisition authority
   5.2.    Classification and reclassification of public land
   5.3.    Development near zone boundaries
   5.4.    Controls relating to miscellaneous permissible uses
   5.5.    (Repealed)
   5.6.    Architectural roof features
   5.7.    Development below mean high water mark
   5.8.    Conversion of fire alarms
   5.9.    5.9AA. (Repealed)
   5.10.   Heritage conservation
   5.11.   Bush fire hazard reduction
   5.12.   Infrastructure development and use of existing buildings of the Crown
   5.13.   Eco-tourist facilities
   5.14.   Siding Spring Observatory--maintaining dark sky
   5.15.   Defence communications facility
   5.16.   Subdivision of, or dwellings on, land in certain rural, residential or environment protection zones
   5.17.   Artificial waterbodies in environmentally sensitive areas in areas of operation of irrigation corporations
   5.18.   Intensive livestock agriculture
   5.19.   Pond-based, tank-based and oyster aquaculture

   PART 6 - ADDITIONAL LOCAL PROVISIONS

   6.1.    Biodiversity
   6.2.    Riparian land, waterways and groundwater vulnerability
   6.3.    Public utility infrastructure availability in Zone RU5 Village
   6.4.    Flood planning
   6.5.    Development on river front areas
   6.6.    Development on riverbeds and banks
   6.7.    Earthworks
           SCHEDULE 1
           SCHEDULE 2
           SCHEDULE 3
           SCHEDULE 4
           SCHEDULE 5
           SCHEDULE 6
           Dictionary


AustLII: Copyright Policy | Disclaimers | Privacy Policy | Feedback