New South Wales Consolidated Regulations
[Index]
[Table]
[Search]
[Search this Regulation]
[Notes]
[Noteup]
[Download]
[Help]
BELLINGEN LOCAL ENVIRONMENTAL PLAN 2010
- Made under the Environmental Planning and Assessment Act 1979
- As at 31 July 2020
- Reg 418 of 2010
TABLE OF PROVISIONS
PART 1 - PRELIMINARY
1.1. Name of Plan
1.1AA. Commencement
1.2. Aims of Plan
1.3. Land to which Plan applies
1.4. Definitions
1.5. Notes
1.6. Consent authority
1.7. Maps
1.8. Repeal of planning instruments applying to land
1.8A. Savings provision relating to development applications
1.9. Application of SEPPs
1.9A. Suspension of covenants, agreements and instruments
PART 2 - PERMITTED OR PROHIBITED DEVELOPMENT
2.1. Land use zones
2.2. Zoning of land to which Plan applies
2.3. Zone objectives and Land Use Table
2.4. Unzoned land
2.5. Additional permitted uses for particular land
2.6. Subdivision--consent requirements
2.7. Demolition requires development consent
2.8. Temporary use of land
Land Use Table
Note
Zone RU1. Primary Production
Zone RU2. Rural Landscape
Zone RU3. Forestry
Zone RU4. Primary Production Small Lots
Zone R1. General Residential
Zone R5. Large Lot Residential
Zone B1. Neighbourhood Centre
Zone B2. Local Centre
Zone IN1. General Industrial
Zone SP1. Special Activities
Zone SP2. Infrastructure
Zone RE1. Public Recreation
Zone RE2. Private Recreation
Zone E1. National Parks and Nature Reserves
Zone E2. Environmental Conservation
Zone E3. Environmental Management
Zone E4. Environmental Living
Zone W1. Natural Waterways
Zone W2. Recreational Waterways
PART 3 - EXEMPT AND COMPLYING DEVELOPMENT
3.1. Exempt development
3.2. Complying development
3.3. Environmentally sensitive areas excluded
PART 4 - PRINCIPAL DEVELOPMENT STANDARDS
4.1. Minimum subdivision lot size
4.1AA. Minimum subdivision lot size for community title schemes
4.1AB. Boundary changes between lots in certain rural, residential, environment protection and waterways zones
4.1AC. Exceptions to minimum subdivision lots sizes for certain split zones
4.2. Rural subdivision
4.2A. Erection of dwelling houses on land in certain rural and environmental protection zones
4.2B. Minimum subdivision lot size for strata subdivision of residential or tourist and visitor accommodation in certain zones
4.3. Height of buildings
4.4. Floor space ratio
4.5. Calculation of floor space ratio and site area
4.6. Exceptions to development standards
PART 5 - MISCELLANEOUS PROVISIONS
5.1. Relevant acquisition authority
5.2. Classification and reclassification of public land
5.3. Development near zone boundaries
5.4. Controls relating to miscellaneous permissible uses
5.5. (Repealed)
5.6. Architectural roof features
5.7. Development below mean high water mark
5.8. Conversion of fire alarms
5.9. 5.9AA. (Repealed)
5.10. Heritage conservation
5.11. Bush fire hazard reduction
5.12. Infrastructure development and use of existing buildings of the Crown
5.13. Eco-tourist facilities
5.14. Siding Spring Observatory--maintaining dark sky
5.15. Defence communications facility
5.16. Subdivision of, or dwellings on, land in certain rural, residential or environment protection zones
5.17. Artificial waterbodies in environmentally sensitive areas in areas of operation of irrigation corporations
5.18. Intensive livestock agriculture
5.19. Pond-based, tank-based and oyster aquaculture
PART 6 - URBAN RELEASE AREAS
6.1. Arrangements for designated State public infrastructure
6.2. Development control plan
6.3. Relationship between Part and remainder of Plan
PART 7 - ADDITIONAL LOCAL PROVISIONS
7.1. Acid sulfate soils
7.2. Earthworks
7.3. Flood planning
7.4. Water
7.5. Biodiversity
7.6. Development in the vicinity of identified mineral resource areas
7.7. Redevelopment of caravan parks and manufactured home estates
7.8. Tourism development in rural and environmental zones
7.9. Public utility infrastructure
7.10. Development on certain land at Railway Street, Dorrigo
SCHEDULE 1
SCHEDULE 2
SCHEDULE 3
SCHEDULE 4
SCHEDULE 5
SCHEDULE 6
Dictionary
AustLII: Copyright Policy
| Disclaimers
| Privacy Policy
| Feedback