New South Wales Consolidated Regulations

[Index] [Table] [Search] [Search this Regulation] [Notes] [Noteup] [Download] [Help]

BURWOOD LOCAL ENVIRONMENTAL PLAN 2012

- Made under the Environmental Planning and Assessment Act 1979
- As at 17 April 2020
- Reg 550 of 2012

TABLE OF PROVISIONS

   PART 1 - PRELIMINARY

   1.1.    Name of Plan
   1.1AA.  Commencement
   1.2.    Aims of Plan
   1.3.    Land to which Plan applies
   1.4.    Definitions
   1.5.    Notes
   1.6.    Consent authority
   1.7.    Maps
   1.8.    Repeal of planning instruments applying to land
   1.8A.   Savings provision relating to development applications
   1.9.    Application of SEPPs
   1.9A.   Suspension of covenants, agreements and instruments

   PART 2 - PERMITTED OR PROHIBITED DEVELOPMENT

   2.1.    Land use zones
   2.2.    Zoning of land to which Plan applies
   2.3.    Zone objectives and Land Use Table
   2.4.    Unzoned land
   2.5.    Additional permitted uses for particular land
   2.6.    Subdivision--consent requirements
   2.7.    Demolition requires development consent
   2.8.    Temporary use of land
           Land Use Table
           Note
           Zone R1. General Residential
           Zone R2. Low Density Residential
           Zone R3. Medium Density Residential
           Zone B1. Neighbourhood Centre
           Zone B2. Local Centre
           Zone B4. Mixed Use
           Zone B6. Enterprise Corridor
           Zone IN2. Light Industrial
           Zone SP2. Infrastructure
           Zone RE1. Public Recreation
           Zone RE2. Private Recreation

   PART 3 - EXEMPT AND COMPLYING DEVELOPMENT

   3.1.    Exempt development
   3.2.    Complying development
   3.3.    Environmentally sensitive areas excluded

   PART 4 - PRINCIPAL DEVELOPMENT STANDARDS

   4.1.    Minimum subdivision lot size
   4.1AA.  Minimum subdivision lot size for community title schemes
   4.1A.   Minimum lot sizes for dual occupancies
   4.2.    Rural subdivision
   4.3.    Height of buildings
   4.3A.   Exceptions to height of buildings
   4.4.    Floor space ratio
   4.4A.   Exceptions to floor space ratio
   4.5.    Calculation of floor space ratio and site area
   4.6.    Exceptions to development standards

   PART 5 - MISCELLANEOUS PROVISIONS

   5.1.    Relevant acquisition authority
   5.1A.   Development on land intended to be acquired for public purposes
   5.2.    Classification and reclassification of public land
   5.3.    Development near zone boundaries
   5.4.    Controls relating to miscellaneous permissible uses
   5.5.    (Repealed)
   5.6.    Architectural roof features
   5.7.    Development below mean high water mark
   5.8.    Conversion of fire alarms
   5.9.    5.9AA. (Repealed)
   5.10.   Heritage conservation
   5.11.   Bush fire hazard reduction
   5.12.   Infrastructure development and use of existing buildings of the Crown
   5.13.   Eco-tourist facilities
   5.14.   Siding Spring Observatory--maintaining dark sky
   5.15.   Defence communications facility
   5.16.   Subdivision of, or dwellings on, land in certain rural, residential or environment protection zones
   5.17.   Artificial waterbodies in environmentally sensitive areas in areas of operation of irrigation corporations
   5.18.   Intensive livestock agriculture
   5.19.   Pond-based, tank-based and oyster aquaculture

   PART 6 - ADDITIONAL LOCAL PROVISIONS

   6.1.    Acid sulfate soils
   6.2.    Flood planning
   6.3.    Active street frontages
   6.4.    Location of sex services premises
   6.5.    Design excellence in Zones B2 and B4
   6.6.    Development on land at Cooper Street, Strathfield
           SCHEDULE 1
           SCHEDULE 2
           SCHEDULE 3
           SCHEDULE 4
           SCHEDULE 5
           SCHEDULE 6
           Dictionary


AustLII: Copyright Policy | Disclaimers | Privacy Policy | Feedback