New South Wales Consolidated Regulations
[Index]
[Table]
[Search]
[Search this Regulation]
[Notes]
[Noteup]
[Download]
[Help]
JERILDERIE LOCAL ENVIRONMENTAL PLAN 2012
- Made under the Environmental Planning and Assessment Act 1979
- As at 17 April 2020
- Reg 263 of 2012
TABLE OF PROVISIONS
PART 1 - PRELIMINARY
1.1. Name of Plan
1.1AA. Commencement
1.2. Aims of Plan
1.3. Land to which Plan applies
1.4. Definitions
1.5. Notes
1.6. Consent authority
1.7. Maps
1.8. Repeal of planning instruments applying to land
1.8A. Savings provision relating to development applications
1.9. Application of SEPPs
1.9A. Suspension of covenants, agreements and instruments
PART 2 - PERMITTED OR PROHIBITED DEVELOPMENT
2.1. Land use zones
2.2. Zoning of land to which Plan applies
2.3. Zone objectives and Land Use Table
2.4. Unzoned land
2.5. Additional permitted uses for particular land
2.6. Subdivision--consent requirements
2.7. Demolition requires development consent
2.8. Temporary use of land
Land Use Table
Note
Zone RU1. Primary Production
Zone RU3. Forestry
Zone RU5. Village
Zone R5. Large Lot Residential
Zone IN1. General Industrial
Zone SP2. Infrastructure
Zone RE1. Public Recreation
Zone RE2. Private Recreation
Zone E1. National Parks and Nature Reserves
Zone W1. Natural Waterways
PART 3 - EXEMPT AND COMPLYING DEVELOPMENT
3.1. Exempt development
3.2. Complying development
3.3. Environmentally sensitive areas excluded
PART 4 - PRINCIPAL DEVELOPMENT STANDARDS
4.1. Minimum subdivision lot size
4.1AA. Minimum subdivision lot size for community title schemes
4.2. Rural subdivision
4.2A. Minimum subdivision lot size for strata plan schemes in certain rural zones
4.2B. Erection of dwelling houses or dual occupancies on land in Zone RU1 Primary Production
4.2C. Erection of rural workers' dwellings in Zone RU1 Primary Production
4.3. Height of buildings
4.4. Floor space ratio
4.5. Calculation of floor space ratio and site area
4.6. Exceptions to development standards
PART 5 - MISCELLANEOUS PROVISIONS
5.1. Relevant acquisition authority
5.2. Classification and reclassification of public land
5.3. Development near zone boundaries
5.4. Controls relating to miscellaneous permissible uses
5.5. (Repealed)
5.6. Architectural roof features
5.7. Development below mean high water mark
5.8. Conversion of fire alarms
5.9. 5.9AA. (Repealed)
5.10. Heritage conservation
5.11. Bush fire hazard reduction
5.12. Infrastructure development and use of existing buildings of the Crown
5.13. Eco-tourist facilities
5.14. Siding Spring Observatory--maintaining dark sky
5.15. Defence communications facility
5.16. Subdivision of, or dwellings on, land in certain rural, residential or environment protection zones
5.17. Artificial waterbodies in environmentally sensitive areas in areas of operation of irrigation corporations
5.18. Intensive livestock agriculture
5.19. Pond-based, tank-based and oyster aquaculture
PART 6 - ADDITIONAL LOCAL PROVISIONS
6.1. Earthworks
6.2. Flood planning
6.3. Stormwater management
6.4. Terrestrial biodiversity
6.5. Groundwater vulnerability
6.6. Riparian land and watercourses
6.7. Wetlands
6.8. Essential services
SCHEDULE 1
SCHEDULE 2
SCHEDULE 3
SCHEDULE 4
SCHEDULE 5
SCHEDULE 6
Dictionary
AustLII: Copyright Policy
| Disclaimers
| Privacy Policy
| Feedback