New South Wales Consolidated Regulations
[Index]
[Table]
[Search]
[Search this Regulation]
[Notes]
[Noteup]
[Download]
[Help]
WATER SHARING PLAN FOR THE BRUNSWICK UNREGULATED AND ALLUVIAL WATER
SOURCES 2016
- Made under the Water Management Act 2000
- As at 6 January 2017
- Reg 386 of 2016
TABLE OF PROVISIONS
PART 1 - INTRODUCTION
Note
1. Name of Plan
2. Nature and status of Plan
3. Commencement
4. Application of Plan
5. Extraction management unit for these water sources
6. Understanding the rules in this Plan
7. Interpretation
PART 2 - VISION, OBJECTIVES, STRATEGIES AND PERFORMANCE INDICATORS
Note
8. Vision statement
9. Acknowledgement
10. Objectives
11. Strategies
12. Performance indicators
PART 3 - BULK ACCESS REGIME
13. Bulk access regime
14. Climatic variability
PART 4 - PLANNED ENVIRONMENTAL WATER PROVISIONS
Note
15. General
16. Commitment and identification of planned environmental water
17. Establishment and maintenance of planned environmental water
PART 5 - REQUIREMENTS FOR WATER
Division 1 - General
18. Application
Division 2 - Requirements for water for basic landholder rights
19. Domestic and stock rights
20. Native title rights
21. Harvestable rights
Division 3 - Requirements for water for extraction under access licences
22. Share components of domestic and stock access licences
23. Share components of local water utility access licences
24. Share components of unregulated river access licences
25. Share components of unregulated river (high flow) access licences
26. Share components of aquifer access licences
PART 6 - LIMITS TO THE AVAILABILITY OF WATER
Note
Division 1 - Long-term average annual extraction limits
27. General
28. Volume of the long-term average annual extraction limits
29. Calculation of current levels of annual extraction
30. Assessment of average annual extractions against long-term average annual extraction limits
31. Compliance with the long-term average annual extraction limit for the EMU
32. Compliance with the long-term average annual extraction limit for the Brunswick River Coastal Floodplain Alluvial Groundwater Source
Division 2 - Available water determinations
33. General
34. Available water determinations made at the commencement of this Plan
35. Available water determinations after the first water year of this Plan
36. Available water determinations for the Upper Brunswick River Water Source
37. Available water determinations for the Brunswick River Coastal Floodplain Alluvial Groundwater Source
PART 7 - RULES FOR GRANTING ACCESS LICENCES
Note
38. Specific purpose access licences
39. Granting of access licences as a result of controlled allocation
PART 8 - RULES FOR MANAGING ACCESS LICENCES
Note
Division 1 - Water allocation account management rules
40. Individual access licence account management rules for these water sources, excluding Upper Brunswick River Water Source and the Brunswick River Coastal Floodplain Alluvial Groundwater Source
41. Individual access licence account management rules for the Upper Brunswick River Water Source
42. Individual access licence account management rules for the Brunswick River Coastal Floodplain Alluvial Groundwater Source
Division 2 - Flow classes and daily access rules
43. General
44. Flow classes
45. Access rules for the taking of surface water
46. Total daily extraction limits
47. Individual daily extraction limits
PART 9 - RULES FOR WATER SUPPLY WORK APPROVALS
Note
Division 1 - Rules applying to the granting or amending of water supply work approvals for water supply works that take surface water
48. General
49. Granting or amending water supply work approvals
Division 2 - Rules applying to the granting or amending of water supply work approvals for water supply works that take groundwater
50. General
51. Rules to minimise interference between water supply works
52. Rules for water supply works located near contamination sources
53. Rules for water supply works located near groundwater-dependent ecosystems
54. Rules for water supply works located near potential acid sulfate soils
55. Rules for water supply works located near groundwater-dependent culturally significant sites
56. Replacement groundwater works
Division 3 - Rules for the use of water supply works used to take groundwater
57. Rules for the use of water supply works located within restricted distances
PART 10 - ACCESS LICENCE DEALING RULES
58. General
59. Conversion of access licence to new category
60. Assignment of rights dealings
61. Amendment of share components dealings (change of water source)
62. Assignment of water allocations dealings
63. Interstate access licence transfer and assignment of water allocation
64. Nomination of water supply works dealings
PART 11 - MANDATORY CONDITIONS
Note
Division 1 - General
65. General
Division 2 - Access licences
Note
66. General
Division 3 - Water supply work approvals
Note
67. General
68. Water supply works authorised to take water from these alluvial sediments
PART 12 - AMENDMENT OF THIS PLAN
69. General
70. Part 1
71. Part 4
72. Part 6
73. Part 8
74. Part 9
75. Part 11
76. Dictionary
77. Schedules
78. Other
Dictionary
SCHEDULE 1
SCHEDULE 2
SCHEDULE 3
APPENDIX 1
APPENDIX 2
APPENDIX 3
APPENDIX 4
AustLII: Copyright Policy
| Disclaimers
| Privacy Policy
| Feedback