New South Wales Consolidated Regulations
[Index]
[Table]
[Search]
[Search this Regulation]
[Notes]
[Noteup]
[Download]
[Help]
WATER SHARING PLAN FOR THE COFFS HARBOUR AREA UNREGULATED AND
ALLUVIAL WATER SOURCES 2009
- Made under the Water Management Act 2000
- As at 8 March 2013
- Reg 345 of 2009
TABLE OF PROVISIONS
PART 1 - INTRODUCTION
1. Name of this Plan
2. Nature and Status of this Plan
3. Date of commencement
4. Water sources to which this Plan applies
5. Management Zones
6. Amendment of this Part
7. Interpretation
PART 2 - VISION, OBJECTIVES, STRATEGIES AND PERFORMANCE INDICATORS
8. Vision, objectives, strategies and performance indicators
9. Vision
10. Objectives
11. Strategies
12. Performance indicators
PART 3 - BASIS FOR WATER SHARING
13. Basis for water sharing
14. Climatic variability
15. Extraction management unit for these water sources
16. Flow reference points
17. Flow classes for these water sources
PART 4 - ENVIRONMENTAL WATER PROVISIONS
18. Environmental water provisions
19. Planned environmental water
20. (Repealed)
PART 5 - BASIC LANDHOLDER RIGHTS
21. Basic landholder rights
22. Domestic and stock rights
23. Native title rights
24. Harvestable rights
PART 6 - BULK ACCESS REGIME
25. Bulk access regime
PART 7 - REQUIREMENTS FOR WATER UNDER ACCESS LICENCES
26. Requirements for water under access licences
27. Share component of domestic and stock access licences
28. Share component of local water utility access licences
29. Share component of unregulated river access licences
30. Share component of unregulated river (high flow) access licences
31. Share component of aquifer access licences
32. Changes to total share components
PART 8 - RULES FOR GRANTING ACCESS LICENCES
33. Rules for granting access licences
PART 9 - RULES FOR GRANTING OR AMENDING WATER SUPPLY WORKS APPROVALS
Division 1 - General
34. Granting or amending water supply works approvals
35. Runoff harvesting dams and in-river dams
36. In-river dams
Division 2 - Water supply works used to take water from the alluvial sediments in these water sources
37. Rules for granting or amending approvals for water supply works used to take water from the alluvial sediments in these water sources
38. Rules for granting or amending water supply works approvals
39. Rules for granting or amending water supply works approvals near contamination sources
40. Rules for granting or amending water supply works approvals near sensitive environmental areas
40A. Rules for the use of water supply works located within restricted distances
PART 10 - LIMITS TO THE AVAILABILITY OF WATER
Division 1 - Long-term average annual extraction limit
41. Limits to the availability of water
42. Extraction management units for these water sources
43. Long-term average annual extraction limit
44. Variation of the long-term average annual extraction limits
45. Assessment of the long-term average annual extraction limit
46. Compliance with the long-term average annual extraction limits
Division 2 - Available water determinations
47. Available water determinations
48. Available water determinations for domestic and stock access licences
49. Available water determinations for local water utility access licences
50. Available water determinations for unregulated river access licences
51. Available water determinations for unregulated river (high flow) access licences
52. Available water determinations for aquifer access licences
PART 11 - RULES FOR MANAGING ACCESS LICENCES
Division 1 - General
53. Rules for managing access licences
Division 2 - Water allocation account management
54. Individual access licence account management rules
Division 3 - Sharing surface water flows on a daily basis
55. Sharing surface water flows on a daily basis
56. Total daily extraction limits
57. Initial assignment of the TDEL to categories of access licence
58. Unassigned TDEL
59. Granting of unassigned TDEL
60. Individual daily extraction limits for access licences
61. Amendments to this Plan for the purposes of sharing of surface water flows on a daily basis
62. Access to the Very Low Flow Class in these water sources
Division 4 - Management of surface and groundwater connectivity
63. Access licences which nominate a water supply work which may be used to take water from the alluvial sediments in these water sources
PART 12 - ACCESS LICENCE DEALING RULES
64. Access licence dealing rules
65. Rules relating to constraints within these water sources
66. Rules for change of water source
67. Rules for conversion of access licence category
68. Rules for interstate access licence transfer and assignment of water allocation
69. Rules for water allocation assignments between water sources
PART 13 - MANDATORY CONDITIONS
Division 1 - General
70. General
Division 2 - Access licences
Note
71. General
Division 3 - Water supply work approvals
Note
72. General
73. Water supply works used to take water from the alluvial sediments in these water sources
74-79. (Repealed)
PART 14 - AMENDMENT OF THIS PLAN
80. Amendment of this Plan
81. Amendments due to floodplain harvesting
82. Amendments for alluvial aquifers downstream of the tidal limit
83. Amendments for stormwater harvesting
84. Amendments in relation to Schedule 2 (Very Low Flow)
85. Amendments in relation to the mandatory conditions
86. Other amendments to this Plan
SCHEDULE 1
SCHEDULE 2
SCHEDULE 3
SCHEDULE 4
APPENDIX 1
APPENDIX 2
APPENDIX 3
AustLII: Copyright Policy
| Disclaimers
| Privacy Policy
| Feedback