- (S.R. 2014, NO. 58) TABLE OF PROVISIONS Long Title PART 1 - Preliminary 1. Short title 2. Commencement 3. Interpretation 4. Certain plumbing and plumbing work exempt 5. Prescribed plumbing work 6. Mandatory notification stages PART 2 - Restrictions 7. Non-complying products and materials 8. Trade waste 9. Swimming pool discharge 10. Backflow prevention devices 11. Installation of on-site waste water management systems 12. Sewerage inlets and drainage flood levels PART 3 - Permits Division 1 - Consideration of application for plumbing permits 13. Reliance on certificate from other person 14. Permit for staged works 15. Modifications to permit application 16. Granting of plumbing permits 17. Distribution of documents 18. Variations to permit 19. Variations to special plumbing permit trade waste 20. Suspension of special plumbing permit 21. Cancellation of special plumbing permit 22. Transfer of special plumbing permit 23. Change of owner, agent of owner, designer or plumber Division 2 - Special plumbing permit conditions 24. Conditions on permit in relation to declared drainage flood level 25. Conditions on permit for trade waste system or on-site waste water management system 26. Conditions on permit for discharge of trade waste 27. Conditions on permit for swimming pool 28. Conditions on permit for backflow prevention device 29. Conditions on permit for basement plumbing work 30. Condition on permit for connection to water supply system, sewerage installation or stormwater system PART 4 - Carrying out Plumbing Work 31. Standard of plumbing work 32. Plumbing work over service easement 33. Products and materials 34. Plumbing work in unregistrable relocatable buildings 35. Responsibility for plumbing work and materials 36. Authorisation to start work 37. Issue and refusal of start-work authorisations 38. Connections to stormwater systems 39. Disconnection of services PART 5 - Inspection and Enforcement 40. Inspections of plumbing work 41. Inspection and testing materials 42. Non-inspection at mandatory notification stage 43. Consent to proceed 44. Direction to uncover plumbing work 45. Written inspection directions 46. Infringement notices PART 6 - Use of On-site Waste Water Management System 47. Use of on-site waste water management system PART 7 - Maintenance and Management 48. Maintenance and management of plumbing installations 49. Maintenance and management of on-site waste water management systems 50. Random inspections 51. Service rate 52. Backflow prevention devices 53. Water temperature control devices PART 8 - Miscellaneous 54. Appeal under regulations 55. Fees SCHEDULE 1 SCHEDULE 2[ Note: This table has been automatically generated and may be incomplete. ]