IRON ORE AGREEMENTS LEGISLATION AMENDMENT BILL 2021

                     Western Australia


Iron Ore Agreements Legislation Amendment
                Bill 2021

                         Contents

        Part 1 -- Preliminary
  1.    Short title                                          2
  2.    Commencement                                         2
        Part 2 -- Iron Ore (Mount
             Goldsworthy) Agreement
             Act 1964 amended
  3.    Act amended                                          3
  4.    Section 3 amended                                    3
  5.    Section 5E inserted                                  3
        5E.      Sixth Variation Agreement             3
  6.    Seventh Schedule inserted                            4
        Seventh Schedule -- Sixth Variation Agreement

        Part 3 -- Iron Ore
             (Goldsworthy-Nimingarra)
             Agreement Act 1972 amended
  7.    Act amended                                         11
  8.    Section 2 amended                                   11
  9.    Section 9 inserted                                  11
        9.       Fourth Variation Agreement            11
  10.   Schedule 5 inserted                                 12
        Schedule 5 -- Fourth Variation Agreement




                              41--1                          page i
                           Western Australia


                     LEGISLATIVE ASSEMBLY


  Iron Ore Agreements Legislation Amendment
                  Bill 2021

                               A Bill for


An Act to amend the Iron Ore (Mount Goldsworthy) Agreement
Act 1964 and the Iron Ore (Goldsworthy-Nimingarra) Agreement
Act 1972.



The Parliament of Western Australia enacts as follows:




                                                           page 1
    Iron Ore Agreements Legislation Amendment Bill 2021
    Part 1         Preliminary

    s. 1



1                          Part 1 -- Preliminary
2   1.       Short title
3            This is the Iron Ore Agreements Legislation Amendment
4            Act 2021.

5   2.       Commencement
6            This Act comes into operation as follows --
7             (a) Part 1 -- on the day on which this Act receives the
8                   Royal Assent;
9             (b) the rest of the Act -- on the day after that day.




    page 2
                         Iron Ore Agreements Legislation Amendment Bill 2021
      Iron Ore (Mount Goldsworthy) Agreement Act 1964 amended         Part 2

                                                                              s. 3



1         Part 2 -- Iron Ore (Mount Goldsworthy) Agreement
2                        Act 1964 amended
3    3.       Act amended
4             This Part amends the Iron Ore (Mount Goldsworthy) Agreement
5             Act 1964.

6    4.       Section 3 amended
7             In section 3 insert in alphabetical order:
8

9                   sixth Variation Agreement means the agreement a
10                  copy of which is set out in the Seventh Schedule;
11


12   5.       Section 5E inserted
13            After section 5D insert:
14


15          5E.     Sixth Variation Agreement
16            (1)   The sixth Variation Agreement is ratified.
17            (2)   The implementation of the sixth Variation Agreement
18                  is authorised.
19            (3)   Without limiting or otherwise affecting the application
20                  of the Government Agreements Act 1979, the sixth
21                  Variation Agreement is to operate and take effect
22                  despite any other Act or law.
23




                                                                        page 3
     Iron Ore Agreements Legislation Amendment Bill 2021
     Part 2         Iron Ore (Mount Goldsworthy) Agreement Act 1964 amended

     s. 6



1    6.       Seventh Schedule inserted
2             After the Sixth Schedule insert:
3


4             Seventh Schedule -- Sixth Variation Agreement
5                                                                      [s. 3]
6

7                                       2021
8

9                  THE HONOURABLE MARK McGOWAN
10            PREMIER OF THE STATE OF WESTERN AUSTRALIA
11                                      AND
12                         BHP MINERALS PTY LTD
13                             ACN 008 694 782
14              MITSUI IRON ORE CORPORATION PTY. LTD.
15                           ACN 050 157 456
16          ITOCHU MINERALS & ENERGY OF AUSTRALIA PTY LTD
17                          ACN 009 256 259
18   ________________________________________________________________
19

20          IRON ORE (MOUNT GOLDSWORTHY) AGREEMENT 1964
21                   RATIFIED VARIATION AGREEMENT
22

23   ________________________________________________________________
24

25

26                               [Solicitor's details]




     page 4
                         Iron Ore Agreements Legislation Amendment Bill 2021
      Iron Ore (Mount Goldsworthy) Agreement Act 1964 amended         Part 2

                                                                                    s. 6



1    THIS AGREEMENT is made this 4th day of August 2021
2

3    BETWEEN
4

5    THE HONOURABLE MARK McGOWAN, BA, LLB, M.L.A., Premier of the
6    State of Western Australia, acting for and on behalf of the said State and its
7    instrumentalities from time to time (the "State") of the one part
8    AND
9    BHP MINERALS PTY LTD ACN 008 694 782 of Level 37, Brookfield Place,
10   125 St Georges Terrace, Perth, Western Australia, MITSUI IRON ORE
11   CORPORATION PTY. LTD. ACN 050 157 456 of Level 25, Exchange Tower,
12   2 The Esplanade, Perth, Western Australia and ITOCHU MINERALS &
13   ENERGY OF AUSTRALIA PTY LTD ACN 009 256 259 of Level 22, Forrest
14   Centre, 221 St Georges Terrace, Perth, Western Australia (together collectively
15   called the "Joint Venturers") of the other part.
16

17   RECITALS
18   A.         The State and the Joint Venturers are now the parties to the agreement
19              dated 15 October 1964 approved by and scheduled to the Iron Ore
20              (Mount Goldsworthy) Agreement Act 1964 and which as subsequently
21              added to, varied or amended is referred to in this Agreement as the
22              "Principal Agreement".
23   B.         The parties wish to vary the provisions of the Principal Agreement on
24              the terms and conditions set out in this Agreement.
25

26   THE PARTIES AGREE AS FOLLOWS:
27   1.         Ratification and operation
28        (1)   This Agreement, other than this clause, does not come into operation
29              except in accordance with subclause (2).
30        (2)   This Agreement, other than this clause, comes into operation on the day
31              on which it is ratified by an Act of the Parliament of Western Australia

                                                                                page 5
     Iron Ore Agreements Legislation Amendment Bill 2021
     Part 2         Iron Ore (Mount Goldsworthy) Agreement Act 1964 amended

     s. 6



1               ("Operative Date") unless, before that day, it terminates under
2               subclauses (4) or (5).
3         (3)   The State must introduce in the Parliament of Western Australia before
4               31 August 2021 or a later date agreed between the parties to this
5               Agreement, a Bill to ratify this Agreement and must endeavour to
6               secure its passage as an Act.
7         (4)   If by 30 April 2022 this Agreement has not been ratified by an Act of
8               the Parliament of Western Australia then, unless the parties to this
9               Agreement otherwise agree, this Agreement terminates on that day and
10              no party hereto will have any claim against any other party hereto with
11              respect to any matter or thing arising out of, done, performed, or omitted
12              to be done or performed under this Agreement.
13        (5)   The parties agree that if the Principal Agreement is otherwise
14              determined in accordance with its provisions on a day prior to the
15              Operative Date, then this Agreement shall also terminate on and from
16              that day and no party hereto will have any claim against any other party
17              hereto with respect to any matter or thing arising out of, done,
18              performed, or omitted to be done or performed under this Agreement.
19   2.         Variations of the Principal Agreement
20              The Principal Agreement is varied as follows:
21        (1)   in clause 1 by inserting in the appropriate alphabetical position the
22              following new definition:
23              "third variation date" means the date on which clause 2 of the variation
24              agreement made on or about 30 July 2021 between the State and the
25              Joint Venturers comes into operation;
26        (2)   by inserting after clause 9DA the following new clause:
27              "9DB.     Commercialisation of certain iron ore stockpiles
28              (1)       In this clause:
29                        "Ore Stockpiles" means the following stockpiles of iron ore
30                        known as:
31                        (a)       Yarrie 2 and Yarrie 3 on mineral lease 249SA
32                                  Section 5;


     page 6
                        Iron Ore Agreements Legislation Amendment Bill 2021
     Iron Ore (Mount Goldsworthy) Agreement Act 1964 amended         Part 2

                                                                                  s. 6



1                   (b)       Cundaline 1, Cundaline 2, Cundaline 3, Cundaline
2                             4, Cundaline 5, Cundaline 6, Cundaline 7,
3                             Cundaline 8, Cundaline 9, Cundaline 10, Cundaline
4                             11 and Cundaline 12 on mineral lease 249SA
5                             Section 4;
6                   (c)       Shay Gap 1 on mineral lease 249SA Section 3; and
7                   (d)       Cattle Gorge 1, Cattle Gorge 2, Cattle Gorge 3,
8                             Cattle Gorge 4, Cattle Gorge 5, Cattle Gorge 6,
9                             Cattle Gorge 7 and Cattle Gorge 8 on mining lease
10                            45/1019-I (produced in each case from mining
11                            operations upon mineral lease 249SA Section 6 and
12                            mining lease 45/1019-I),
13                  comprising in aggregate approximately 3.718 million tonnes
14                  of iron ore and identified on a plan titled 'Mount Goldsworthy
15                  Ore Stockpiles' and initialled by the parties;
16                  "commercialisation activities" in relation to a Ore Stockpile
17                  means such works and activities as may be reasonably
18                  necessary for the Joint Venturers to carry out to achieve the
19                  sale of the iron ore to an arm's length purchaser at the time the
20                  relevant iron ore crosses the boundary of the mining tenement
21                  or tenements upon which its source stockpile is situated (or
22                  such other boundary of a mining tenement held by the Joint
23                  Venturers as the Minister may approve) including:
24                  (a)       crushing, screening, beneficiation          or    other
25                            processing works and activities;
26                  (b)       subject to the Minister being reasonably satisfied
27                            that there are in place adequate systems and controls
28                            for the correct apportionment of the quantities
29                            of iron ore being blended, blending with iron ore
30                            from a 'Ore Stockpile' as defined by clause 16BB
31                            of the agreement approved by and scheduled to
32                            the Iron Ore (Goldsworthy-Nimingarra) Agreement
33                            Act 1972, as from time to time added to, varied or
34                            amended;
35                  (c)       handling and transport works and activities,
36                            including by road; and

                                                                               page 7
     Iron Ore Agreements Legislation Amendment Bill 2021
     Part 2         Iron Ore (Mount Goldsworthy) Agreement Act 1964 amended

     s. 6



1                     (d)       ancillary works and activities,
2                     and, for the avoidance of doubt, does not include any works
3                     and activities beyond the point of sale.
4             (2)     Notwithstanding clause 9(2)(e) and subject to this clause, the
5                     Joint Venturers may, as one or more additional proposals
6                     pursuant to clause 7A and subject to the EP Act, propose to
7                     undertake pursuant to this Agreement commercialisation
8                     activities in respect of one or more of the Ore Stockpiles and
9                     each such proposal shall constitute a proposed development
10                    for the purposes of clauses 7D(6) and 7E(5).
11            (3)     The Joint Venturers may only submit an additional proposal
12                    pursuant to clause 7A for the purposes of subclause (2) for a
13                    period of 5 years from the third variation date, which period
14                    may not be extended further pursuant to clause 24.
15            (4)     Notwithstanding the proviso to clause 8(2)(b) and
16                    clauses 9(2)(j) and 9(2)(k), which for the avoidance of doubt
17                    shall not apply with respect to the iron ore comprising the Ore
18                    Stockpiles, the parties agree that the Mining Act 1978 shall be
19                    deemed to apply to the calculation, payment and
20                    administration of royalties and additional rental in relation to
21                    that iron ore to the effect that the Joint Venturers shall be
22                    liable to pay to the State royalties and additional rental under
23                    and in accordance with that Act on all iron ore sold pursuant
24                    to this clause."




     page 8
                          Iron Ore Agreements Legislation Amendment Bill 2021
       Iron Ore (Mount Goldsworthy) Agreement Act 1964 amended         Part 2

                                                                                  s. 6



1    EXECUTED as a deed.
2

3    SIGNED by THE HONOURABLE                )
4    MARK McGOWAN                            )                  [Signature]
5    in the presence of:                     )
6
7     [Signature]
8    ______________________________
9     Signature of witness
10

11    NADEEN LYN ROBERTS
12   ______________________________
13    Name of witness
14

15

     EXECUTED by BHP MINERALS                )
     PTY LTD ACN 008 694 782                 )
     in accordance with section 127(1)       )
     of the Corporations Act 2001 (Cth)      )
     by authority of its directors:
     [Signature]                                 [Signature]
      ...  ...  ...  ...  ...  ...  ...  ...  ...  ...  ...  ...  ...  ... ...                            ...  ...  ...  ...  ...  ...  ...  ...  ...  ...  ...  ...  ...  ... ...
     Signature of director                       Signature of director/
                                                 company secretary*

     BRANDON KYLE CRAIG                          NICOLE DE VILLIERS
      ...  ...  ...  ...  ...  ...  ...  ...  ...  ...  ...  ...  ...  ... ...                            ...  ...  ...  ...  ...  ...  ...  ...  ...  ...  ...  ...  ...  ... ...
     Full name of director (block letters)       Full name of director/
                                                 company secretary* (block letters)
                                                 *delete whichever is not applicable




                                                                              page 9
    Iron Ore Agreements Legislation Amendment Bill 2021
    Part 2         Iron Ore (Mount Goldsworthy) Agreement Act 1964 amended

    s. 6



    EXECUTED by MITSUI IRON                 )
    ORE CORPORATION                         )
    PTY. LTD. ACN 050 157 456               )
    in accordance with section 127(1)       )
    of the Corporations Act 2001 (Cth)
    by authority of its directors:
    [Signature]                                 [Signature]
     ...  ...  ...  ...  ...  ...  ...  ...  ...  ...  ...  ...  ...  ... ...                            ...  ...  ...  ...  ...  ...  ...  ...  ...  ...  ...  ...  ...  ... ...
    Signature of director                       Signature of director/company
                                                secretary*

    MOTOI YAMAMOTO                              GAVIN PATTERSON
     ...  ...  ...  ...  ...  ...  ...  ...  ...  ...  ...  ...  ...  ... ...                            ...  ...  ...  ...  ...  ...  ...  ...  ...  ...  ...  ...  ...  ... ...
    Full name of director (block letters)       Full name of director/company
                                                secretary* (block letters)
                                                *delete whichever is not applicable
1

    EXECUTED by ITOCHU                      )
    MINERALS & ENERGY OF                    )
    AUSTRALIA PTY. LTD.                     )
    ACN 009 256 259                         )
    in accordance with section 127(1)
    of the Corporations Act 2001 (Cth)
    by authority of its directors:
    [Signature]                                 [Signature]
     ...  ...  ...  ...  ...  ...  ...  ...  ...  ...  ...  ...  ...  ... ...                            ...  ...  ...  ...  ...  ...  ...  ...  ...  ...  ...  ...  ...  ... ...
    Signature of director                       Signature of director/
                                                company secretary*

    DAISUKE INOUE                               NORIMASA MATSUZAWA
     ...  ...  ...  ...  ...  ...  ...  ...  ...  ...  ...  ...  ...  ... ...                            ...  ...  ...  ...  ...  ...  ...  ...  ...  ...  ...  ...  ...  ... ...
    Full name of director (block letters)       Full name of director/
                                                company secretary* (block letters)
                                                *delete whichever is not applicable
2




    page 10
                        Iron Ore Agreements Legislation Amendment Bill 2021
          Iron Ore (Goldsworthy-Nimingarra) Agreement Act 1972       Part 3
                                                     amended

                                                                               s. 7


1          Part 3 -- Iron Ore (Goldsworthy-Nimingarra)
2                 Agreement Act 1972 amended
3    7.        Act amended
4              This Part amends the Iron Ore (Goldsworthy-Nimingarra)
5              Agreement Act 1972.

6    8.        Section 2 amended
7              In section 2 insert in alphabetical order:
8

9                    the Fourth Variation Agreement means the agreement
10                   a copy of which is set out in Schedule 5;
11


12   9.        Section 9 inserted
13             After section 8 insert:
14


15        9.         Fourth Variation Agreement
16             (1)   The Fourth Variation Agreement is ratified.
17             (2)   The implementation of the Fourth Variation Agreement
18                   is authorised.
19             (3)   Without limiting or otherwise affecting the application
20                   of the Government Agreements Act 1979, the Fourth
21                   Variation Agreement is to operate and take effect
22                   despite any other Act or law.
23




                                                                        page 11
     Iron Ore Agreements Legislation Amendment Bill 2021
     Part 3         Iron Ore (Goldsworthy-Nimingarra) Agreement Act 1972
                    amended

     s. 10


1    10.       Schedule 5 inserted
2              After Schedule 4 insert:
3


4                Schedule 5 -- Fourth Variation Agreement
5                                                                          [s. 2]
6                                         2021
7                   THE HONOURABLE MARK McGOWAN
8              PREMIER OF THE STATE OF WESTERN AUSTRALIA
9                                         AND
10                          BHP MINERALS PTY LTD
11                              ACN 008 694 782
12                MITSUI IRON ORE CORPORATION PTY. LTD
13                            ACN 050 157 456
14           ITOCHU MINERALS & ENERGY OF AUSTRALIA PTY LTD
15                           ACN 009 256 259
16   ________________________________________________________________
17

18     IRON ORE (GOLDSWORTHY-NIMINGARRA) AGREEMENT 1972
19                    RATIFIED VARIATION AGREEMENT
20

21   ________________________________________________________________
22

23

24                                [Solicitor's details]




     page 12
                              Iron Ore Agreements Legislation Amendment Bill 2021
                Iron Ore (Goldsworthy-Nimingarra) Agreement Act 1972       Part 3
                                                           amended

                                                                                    s. 10


1    THIS AGREEMENT is made this 4th day of August 2021
2

3    BETWEEN
4

5    THE HONOURABLE MARK McGOWAN, BA, LLB, M.L.A., Premier of the
6    State of Western Australia, acting for and on behalf of the said State and its
7    instrumentalities from time to time (the "State") of the one part
8    AND
9    BHP MINERALS PTY LTD ACN 008 694 782 of Level 37, Brookfield Place,
10   125 St Georges Terrace, Perth, Western Australia, MITSUI IRON ORE
11   CORPORATION PTY. LTD. ACN 050 157 456 of Level 25, Exchange Tower,
12   2 The Esplanade, Perth, Western Australia and ITOCHU MINERALS &
13   ENERGY OF AUSTRALIA PTY LTD ACN 009 256 259 of Level 22, Forrest
14   Centre, 221 St Georges Terrace, Perth, Western Australia (together collectively
15   called the "Joint Venturers") of the other part.
16

17   RECITALS
18   A.           The State and the Joint Venturers are now the parties to the agreement
19                dated 12 April 1972 approved by and scheduled to the Iron Ore
20                (Goldsworthy-Nimingarra) Agreement Act 1972 and which as
21                subsequently added to, varied or amended is referred to in this
22                Agreement as the "Principal Agreement".
23   B.           The parties wish to vary the provisions of the Principal Agreement on
24                the terms and conditions set out in this Agreement.
25

26   THE PARTIES AGREE AS FOLLOWS:
27   1.           Ratification and operation
28        (1)     This Agreement, other than this clause, does not come into operation
29                except in accordance with subclause (2).
30        (2)     This Agreement, other than this clause, comes into operation on the day
31                on which it is ratified by an Act of the Parliament of Western Australia

                                                                                 page 13
     Iron Ore Agreements Legislation Amendment Bill 2021
     Part 3         Iron Ore (Goldsworthy-Nimingarra) Agreement Act 1972
                    amended

     s. 10


1               ("Operative Date") unless, before that day, it terminates under
2               subclauses (4) or (5).
3         (3)   The State must introduce in the Parliament of Western Australia before
4               31 August 2021 or a later date agreed between the parties to this
5               Agreement, a Bill to ratify this Agreement and must endeavour to
6               secure its passage as an Act.
7         (4)   If by 30 April 2022 this Agreement has not been ratified by an Act of
8               the Parliament of Western Australia then, unless the parties to this
9               Agreement otherwise agree, this Agreement terminates on that day and
10              no party hereto will have any claim against any other party hereto with
11              respect to any matter or thing arising out of, done, performed, or omitted
12              to be done or performed under this Agreement.
13        (5)   The parties agree that if the Principal Agreement is otherwise
14              determined in accordance with its provisions on a day prior to the
15              Operative Date, then this Agreement shall also terminate on and from
16              that day and no party hereto will have any claim against any other party
17              hereto with respect to any matter or thing arising out of, done,
18              performed, or omitted to be done or performed under this Agreement.
19   2.         Variations of the Principal Agreement
20              The Principal Agreement is varied as follows:
21        (1)   in clause 1 by inserting in the appropriate alphabetical position the
22              following new definition:
23              "third variation date" means the date on which clause 2 of the variation
24              agreement made on or about 30 July 2021 between the State and the
25              Joint Venturers comes into operation;
26        (2)   by inserting after clause 16B the following new clause:
27              "16BB. Commercialisation of certain iron ore stockpiles
28              (1)       In this clause:
29                        "Ore Stockpiles" means the following stockpiles of iron ore
30                        known as:
31                        (a)       Sunrise Hill 1 on mining lease 263SA Section 1 and
32                                  Section 5;


     page 14
                   Iron Ore Agreements Legislation Amendment Bill 2021
     Iron Ore (Goldsworthy-Nimingarra) Agreement Act 1972       Part 3
                                                amended

                                                                           s. 10


1               (b)       Sunrise Hill 2 on mineral lease 251SA Section 1 and
2                         mining lease 263SA Section 5;
3               (c)       Sunrise Hill 3, Sunrise Hill 4, Sunrise Hill 5 and
4                         Sunrise Hill 6 on mineral lease 251SA Section 1;
5               (d)       Sunrise Hill 7, Sunrise Hill 8 and Sunrise Hill 9 on
6                         mining lease 263SA Section 1;
7               (e)       Nimingarra 1, Nimingarra 3 and Nimingarra 4
8                         (being two stockpiles) on mining lease 263SA
9                         Section 1;
10              (f)       Nimingarra 2 on mining lease 263SA Section 2;
11              (g)       Yarrie 1 on mining lease 263SA Section 8; and
12              (h)       Yarrie 4 and Yarrie 5 on mining lease 263SA
13                        Section 4,
14              comprising in aggregate approximately 3.704 million tonnes
15              of iron ore and identified on a plan titled
16              'Goldsworthy-Nimingarra Ore Stockpiles' and initialled by
17              the parties;
18              "commercialisation activities" in relation to a Ore Stockpile
19              means such works and activities as may be reasonably
20              necessary for the Joint Venturers to carry out to achieve the
21              sale of the iron ore to an arm's length purchaser at the time the
22              relevant iron ore crosses the boundary of the mining tenement
23              or tenements upon which its source stockpile is situated (or
24              such other boundary of a mining tenement held by the Joint
25              Venturers as the Minister may approve) including:
26              (a)       crushing, screening, beneficiation          or   other
27                        processing works and activities;
28              (b)       subject to the Minister being reasonably satisfied
29                        that there are in place adequate systems and controls
30                        for the correct apportionment of the quantities of
31                        iron ore being blended, blending with iron ore from
32                        a 'Ore Stockpile' as defined by clause 9DB of the
33                        agreement approved by and scheduled to the Iron


                                                                       page 15
     Iron Ore Agreements Legislation Amendment Bill 2021
     Part 3         Iron Ore (Goldsworthy-Nimingarra) Agreement Act 1972
                    amended

     s. 10


1                               Ore (Mount Goldsworthy) Agreement Act 1964, as
2                               from time to time added to, varied or amended;
3                     (c)       handling and transport works and activities,
4                               including by road; and
5                     (d)       ancillary works and activities,
6                     and, for the avoidance of doubt, does not include any works
7                     and activities beyond the point of sale.
8              (2)    Notwithstanding clause 13 and subject to this clause, the Joint
9                     Venturers may, as one or more additional proposals pursuant
10                    to clause 8 and subject to the EP Act, propose to undertake
11                    pursuant to this Agreement commercialisation activities in
12                    respect of one or more of the Ore Stockpiles and each such
13                    proposal shall constitute a proposed development for the
14                    purposes of clauses 8C(6) and 8D(5).
15             (3)    The Joint Venturers may only submit an additional proposal
16                    pursuant to clause 8 for the purposes of subclause (2) for a
17                    period of 5 years from the third variation date, which period
18                    may not be extended further pursuant to clause 44.
19             (4)    Notwithstanding clauses 11(3) and 33, which for the
20                    avoidance of doubt shall not apply with respect to the iron ore
21                    comprising the Ore Stockpiles, the parties agree that the
22                    Mining Act 1978 shall be deemed to apply to the calculation,
23                    payment and administration of royalties and additional rental
24                    in relation to that iron ore to the effect that the Joint Venturers
25                    shall be liable to pay to the State royalties and additional
26                    rental under and in accordance with that Act on all iron ore
27                    sold pursuant to this clause."




     page 16
                         Iron Ore Agreements Legislation Amendment Bill 2021
           Iron Ore (Goldsworthy-Nimingarra) Agreement Act 1972       Part 3
                                                      amended

                                                                                s. 10


1    EXECUTED as a deed.
2

3    SIGNED by THE HONOURABLE                )
4    MARK McGOWAN                            )                  [Signature]
5    in the presence of:                     )
6
7     [Signature]
8    ______________________________
9     Signature of witness
10

11    NADEEN LYN ROBERTS
12   ______________________________
13    Name of witness
14

15

     EXECUTED by BHP MINERALS                )
     PTY LTD ACN 008 694 782                 )
     in accordance with section 127(1)       )
     of the Corporations Act 2001 (Cth)      )
     by authority of its directors:
     [Signature]                                 [Signature]
      ...  ...  ...  ...  ...  ...  ...  ...  ...  ...  ...  ...  ...  ... ...                            ...  ...  ...  ...  ...  ...  ...  ...  ...  ...  ...  ...  ...  ... ...
     Signature of director                       Signature of director/
                                                 company secretary*

     BRANDON KYLE CRAIG                          NICOLE DE VILLIERS
      ...  ...  ...  ...  ...  ...  ...  ...  ...  ...  ...  ...  ...  ... ...                            ...  ...  ...  ...  ...  ...  ...  ...  ...  ...  ...  ...  ...  ... ...
     Full name of director (block letters)       Full name of director/
                                                 company secretary* (block letters)
                                                 *delete whichever is not applicable




                                                                              page 17
    Iron Ore Agreements Legislation Amendment Bill 2021
    Part 3         Iron Ore (Goldsworthy-Nimingarra) Agreement Act 1972
                   amended

    s. 10


    EXECUTED by MITSUI IRON                 )
    ORE CORPORATION                         )
    PTY. LTD. ACN 050 157 456               )
    in accordance with section 127(1)       )
    of the Corporations Act 2001 (Cth)
    by authority of its directors:
    [Signature]                                 [Signature]
     ...  ...  ...  ...  ...  ...  ...  ...  ...  ...  ...  ...  ...  ... ...                            ...  ...  ...  ...  ...  ...  ...  ...  ...  ...  ...  ...  ...  ... ...
    Signature of director                       Signature of director/
                                                company secretary*

    MOTOI YAMAMOTO                              GAVIN PATTERSON
     ...  ...  ...  ...  ...  ...  ...  ...  ...  ...  ...  ...  ...  ... ...                            ...  ...  ...  ...  ...  ...  ...  ...  ...  ...  ...  ...  ...  ... ...
    Full name of director (block letters)       Full name of director/
                                                company secretary* (block letters)
                                                *delete whichever is not applicable
1

    EXECUTED by ITOCHU                      )
    MINERALS & ENERGY OF                    )
    AUSTRALIA PTY. LTD.                     )
    ACN 009 256 259                         )
    in accordance with section 127(1)
    of the Corporations Act 2001 (Cth)
    by authority of its directors:
    [Signature]                                 [Signature]
     ...  ...  ...  ...  ...  ...  ...  ...  ...  ...  ...  ...  ...  ... ...                            ...  ...  ...  ...  ...  ...  ...  ...  ...  ...  ...  ...  ...  ... ...
    Signature of director                       Signature of director/
                                                company secretary*

    DAISUKE INOUE                               NORIMASA MATSUZAWA
     ...  ...  ...  ...  ...  ...  ...  ...  ...  ...  ...  ...  ...  ... ...                            ...  ...  ...  ...  ...  ...  ...  ...  ...  ...  ...  ...  ...  ... ...
    Full name of director (block letters)       Full name of director/
                                                company secretary* (block letters)
                                                *delete whichever is not applicable
2




 


[Index] [Search] [Download] [Related Items] [Help]