Tasmanian Numbered Regulations
[Index]
[Table]
[Search]
[Search this Regulation]
[Notes]
[Noteup]
[Download]
[Help]
PLUMBING REGULATIONS 2014 (S.R. 2014, NO. 58)
- (S.R. 2014, NO. 58)
TABLE OF PROVISIONS
Long Title
PART 1 - Preliminary
1. Short title
2. Commencement
3. Interpretation
4. Certain plumbing and plumbing work exempt
5. Prescribed plumbing work
6. Mandatory notification stages
PART 2 - Restrictions
7. Non-complying products and materials
8. Trade waste
9. Swimming pool discharge
10. Backflow prevention devices
11. Installation of on-site waste water management systems
12. Sewerage inlets and drainage flood levels
PART 3 - Permits
Division 1 - Consideration of application for plumbing permits
13. Reliance on certificate from other person
14. Permit for staged works
15. Modifications to permit application
16. Granting of plumbing permits
17. Distribution of documents
18. Variations to permit
19. Variations to special plumbing permit trade waste
20. Suspension of special plumbing permit
21. Cancellation of special plumbing permit
22. Transfer of special plumbing permit
23. Change of owner, agent of owner, designer or plumber
Division 2 - Special plumbing permit conditions
24. Conditions on permit in relation to declared drainage flood level
25. Conditions on permit for trade waste system or on-site waste water management system
26. Conditions on permit for discharge of trade waste
27. Conditions on permit for swimming pool
28. Conditions on permit for backflow prevention device
29. Conditions on permit for basement plumbing work
30. Condition on permit for connection to water supply system, sewerage installation or stormwater system
PART 4 - Carrying out Plumbing Work
31. Standard of plumbing work
32. Plumbing work over service easement
33. Products and materials
34. Plumbing work in unregistrable relocatable buildings
35. Responsibility for plumbing work and materials
36. Authorisation to start work
37. Issue and refusal of start-work authorisations
38. Connections to stormwater systems
39. Disconnection of services
PART 5 - Inspection and Enforcement
40. Inspections of plumbing work
41. Inspection and testing materials
42. Non-inspection at mandatory notification stage
43. Consent to proceed
44. Direction to uncover plumbing work
45. Written inspection directions
46. Infringement notices
PART 6 - Use of On-site Waste Water Management System
47. Use of on-site waste water management system
PART 7 - Maintenance and Management
48. Maintenance and management of plumbing installations
49. Maintenance and management of on-site waste water management systems
50. Random inspections
51. Service rate
52. Backflow prevention devices
53. Water temperature control devices
PART 8 - Miscellaneous
54. Appeal under regulations
55. Fees
SCHEDULE 1
SCHEDULE 2
AustLII: Copyright Policy
| Disclaimers
| Privacy Policy
| Feedback